- Joined
- Apr 19, 2013
- Messages
- 24,031
- Reaction score
- 11,309
Joe Soto is a once in a life time fighter though.this will be a flashy fight, but TJ's entire style was built around a flat footed baroa.
He had trouble against Joe Soto.....joe soto ffs. let that sink in.
![]()
sarcasm?Joe Soto is a once in a life time fighter though.
I know you are new to this mma thing but Jack Slack is patheticIf it's not from Jack Slack I don't wanna waste my time watching it.
I know you are new to this mma thing but Jack Slack is pathetic
woo woo woo Did you tell him you understood he was new to the MMA thing because he is a white belt on this forum?I know you are new to this mma thing but Jack Slack is pathetic
You mean 'ruin'?woo woo woo Did you tell him you understood he was new to the MMA thing because he is a white belt on this forum?
I am a White belt but have seen every single UFC and have all the VHS UFC's starting in 1993 because that was the only way to see it then
Have bought or streamed illegally don't tell anybody every PPV event and I am a white belt in this forum because I can stay away from my wife and her complaining with things like this
This forum might save my marriage and life but please nobody start thinking because they post here they are some bad ass or some shit lol your just typing and googling like everybody else