• Xenforo Cloud is upgrading us to version 2.3.8 on Monday February 16th, 2026 at 12:00 AM PST. Expect a temporary downtime during this process. More info here

Dominick Cruz Footwork Breakdown + Drills (via fightTIPS)

this will be a flashy fight, but TJ's entire style was built around a flat footed baroa.

He had trouble against Joe Soto.....joe soto ffs. let that sink in.
im-a-snake-gif.gif
 
Last edited:
I love fight week when all the breakdown videos start flowing in.
 
If it's not from Jack Slack I don't wanna waste my time watching it.
 
dom will dance all over TJ. I just hope cruz doesnt get caught because he keeps them hands low
 
I keep thinking Cruz will get injured in this fight. I feel it in my gut. But I can't get odds on TJ good enough to bite.
 
Sweet this is the first video as far as tips etc I have watched that somebody posted about somebody that did not leaving mad as a motha%^&$ when I was done watching

pretty good
 
...Anyone else laugh their ass off at the weird UFC interview between TJ and Cruz (mid Lawler/Condit card)...what the fuck kind of 'interview' was that supposed to be.

Looked like one of your WWE skits that lost its script and had to rely on cruz riffing trash talk for five agonizing minutes.
 
I know you are new to this mma thing but Jack Slack is pathetic
woo woo woo Did you tell him you understood he was new to the MMA thing because he is a white belt on this forum?
I am a White belt but have seen every single UFC and have all the VHS UFC's starting in 1993 because that was the only way to see it then
Have bought or streamed illegally don't tell anybody every PPV event and I am a white belt in this forum because I can stay away from my wife and her complaining with things like this
This forum might save my marriage and life but please nobody start thinking because they post here they are some bad ass or some shit lol your just typing and googling like everybody else
 
woo woo woo Did you tell him you understood he was new to the MMA thing because he is a white belt on this forum?
I am a White belt but have seen every single UFC and have all the VHS UFC's starting in 1993 because that was the only way to see it then
Have bought or streamed illegally don't tell anybody every PPV event and I am a white belt in this forum because I can stay away from my wife and her complaining with things like this
This forum might save my marriage and life but please nobody start thinking because they post here they are some bad ass or some shit lol your just typing and googling like everybody else
You mean 'ruin'?
Otherwise...alright, I hear your cries for respect. I believe you.
 
Back
Top